Brochures

EXPERIENCE AND FLEXIBILITY MEANS PHARMA CLIENT MEETS TOUGH REGULATORY DEADLINE AND SAVES MILLIONS IN POTENTIAL LOST REVENUE

The client needed a fully operational solution within a 90-day window to continue operating in one of their overseas markets. Laboratory conditions meant the fabrication materials were strictly controlled.

Read the full case study here.

DRB INCREASES TRAIN WHEEL REMOVAL EFFICIENCY BY 87% AND REDUCES MAINTENANCE COSTS WHILE IMPROVING SAFETY PRACTICES

The customer faced a long-standing issue during essential train maintenance. The method they were using to remove wheels from their axles took 2 hours per wheel, caused damage to the axles, and required human intervention.

Read the full case study here.

OEM modifications reduces unplanned downtime and maintenance costs

The customer uses the grabs to mix the waste and feed it into the Boilers. The nature of this process puts a lot of stress onto the grab arms, leading to premature wear and failure. Therefore any unplanned downtime has an effect on production.

Read the full case study here.

DRB HELPS VEOLIA MAKE THEIR HIGH TEMPERATURE INCINERATOR MAINTENANCE SAFER AND FASTER

Following the installation of a new high temperature incinerator, the customer needed a way to perform annual maintenance in the safest way possible.

Read the full case study here.

DRB HELPS VEOLIA REDUCE DOWNTIME AND MAINTENANCE COSTS WITH BESPOKE LIME SLAKER SYSTEM

Read how our technical intelligence coupled with practical experience has helped Veolia to achieve significant cost savings, increased up-time and additional improvements built in too.

Read the full case study here.

Book a Workshop tour

Book a tour of our 6.5-acre workshop to see the breadth of our operations and meet the people inside the overalls.

Sign-up to Our Newsletter

Join our mailing list to receive the latest news and updates from our team.

You have Successfully Subscribed!